Artificial Turf Field and Track Upgrading

Customer Service

Workmanship / Quality

Repair Capital Cost Saving

Issue Remediation

Overall Rating

West Humber Collegiate Institute

Client: Toronto District School Board

Where: 1675 Martin Grove Rd, Etobicoke, ON M9V 3S3

What We Did: Installation of 7300 sq. ft of artificial turf to the outdoor sports field and upgrading of the surrounding 400 m track with paved asphalt. In addition, Duron’s Restoration crew outfitted the field with a complex sub-terrain Weeping Tile Drainage System using perforated pipes and granular. This resulted in maximum drainage performance to allow for field use even during heavy rainfall.

Challenges: Working with tight deadlines required high efficiency and little room for error. The deadline was met while still delivering a product of exceptional quality.