Traffic & Pedestrian Walkway Toppings

Customer Service

Workmanship / Quality

Repair Capital Cost Saving

Issue Remediation

Overall Rating

TTC Arrow Road Garage

Client: Toronto Transit Commission

Where: 700 Arrow Rd, North York, ON M9M 2M1

What We Did: Traffic Topping installed to 20,000 sq. ft of the TTC Arrow Road Garage. The installation was within the bus wash and maintenance facilities over existing concrete flooring. A Sika Floor full-broadcast system was use in red for the bus lanes and safety yellow for the fueling station.

Challenges: Working over existing concrete floor that was loose and debonding, which required repairs prior to Traffic Topping installation. Additionally, a special primer had to be used as the concrete substrate was saturated with water in the bus wash station. Maintaining crisp separation lines between the different coloured floors required high attention to detail.